Fostering Learner Investment in Nepalese EFL Classrooms through Project-Based Language Learning Approach

Mr. Dev Ram Joshi

Introduction

Project-based language learning is a procedural approach of language learning activities through the planning, exploring, analyzing, and synthesizing, in which the learners present their findings in the class either orally or in written form (Beckett, 1999). Dhungana (2025) believes that the project-based learning (PBL) model encourages students to learn actively by using different strategies to develop their language skills and improve achievement. He further supported this model as an opportunity and a transformative method to develop the 21st-century skills in the learners to maintain international standards. Furthermore, PBL creates a productive environment for learning, but the projects are to be selected rigorously, students are to be guided in each step, and there should be proper assessment of the students to encourage all of them for meaningful learning and cosy presentation in the class (Fleming, 2000). PBL can be taken as an innovative and inquiry-based learning method that fosters learners’ active engagement in language learning through continuous guidance of teachers and exploration of students. This framework of learning develops not only the language skills but also the soft skills during the process of conducting and completing the project works (Ecuador, 2019; Maulina, 2024; Nasir & Dermawan, 2021).

The concept of PBL was developed by stepping on the project method (Kilpatrick, 1918), experiential learning and teaching (Dewey, 1938), and sociocultural theory (Vygotsky, 1978). Similarly, the historical steps for this approach began after the 1980s, when a task-based approach to language learning took place in ELT (Beckett & Slater, 2005; Wang, 2020). In the context of Nepal, this method gained value in the Nepalese education system when the national curriculum framework (2076 B.S.) envisioned life skill-based and competency-based subject-wise curricula. Then, the English curricula and textbooks, including other subjects, incorporated project works after each chapter of the textbooks from grades six to twelve. Additionally, the curriculum development centre has designed an internal evaluation guideline (2080 B.S.), which provides rubrics to evaluate students’ project works and other academic activities objectively and reliably.

Regarding empirical studies on project-based learning (PBL), the existing literature focuses on the effectiveness, challenges, and possibilities of PBL in the EFL classroom (Dhungana, 2025; Sanchez, 2019; Maulina, 2024; Devkota et al., 2017; Guslyakova et al., 2021; Aldabbus, 2018). Likewise, other studies have focused on how PBL fosters learner active participation and confidence of students in EFL classrooms (Aubrey, 2021; Giri, 2016; Nasir & Dermawan, 2022). Furthermore, Bastola (2021) examined how PBL can guide students to solve problems while learning English. Acharya (2023) analyzed the perceptions, practices, and challenges while applying PBL in health education. Gibbes and Carson (2014) scrutinized PBL from learners’ perspectives, Yuliani (2017) studied how PBL can enhance learner autonomy, and Somani and Rizvi (2018) compared PBL and traditional approaches of language teaching under a quasi-experimental design. However, I could not find the studies on PBL that investigated it to promote English language learner investment and integration of internal assessment with it.

I found my students avoiding investing in English language learning, which led them to low performance in all skills and aspects of language activities. Then, I asked them how much time they invest in English, and they replied that they only spent five to twenty minutes on English, and they again added that they usually do not pay much attention to the English subject, as they can pass it. I thought that if they depend only on classroom teaching and do not put in extra efforts outside the class, they might not perform what the are capable of. Similarly, overconfidence and exam-focused preparation in any subject is not good for knowledge and personal development. Therefore, this study aims to enhance learner investment through PBL incorporated with internal assessment techniques in secondary level students of Nepalese public schools by using the following research questions.

  1. How does PBL, integrated with internal assessment, enhance learner investment in learning English?
  2. What are the challenges and possibilities while implementing PBL in the EFL classroom?

Methods

As a practitioner teacher, I improve my professional practices with the help of action research by following the steps: planning, acting, observing, and reflecting (PAOR) (Burns, 2010). In this research, I have employed a project-based language learning approach integrated with an internal assessment system as the interventional technique to increase the time, effort, and dedication of my secondary level students in English language learning under the framework of technical action research by following the PAOR structure (Kemmis et al., 2014). The students of grade nine and ten (e.g. English medium sections of 9A and 10A), who numbered thirty and fifty students respectively, were the participants. I got my students to complete the projects mentioned in the textbook in regular teaching. Here I have presented projects: reading, writing, observing, and giving a speech project and peer/classroom teaching as the integrated project works, which I had provided during two long vacations, and I supported them to present their projects in the class. I observed how they have prepared and what resources they have studied, I collected their reports and looked at them closely, and I observed their classroom presentation by following the rubrics. Similarly, I had surveyed the status of students about their time, efforts, and dedication that they have about English language learning by asking open-ended questions. Finally, I analyzed the reflections that occurred in the class based on thematic analysis, followed by research questions and themes generated from classroom performance of students (Burns, 2010; Kemmis, McTaggart, & Nixon, 2014; Mertler, 2019).

Results and Discussion

Reading, Writing, Observing, and Giving Speech Project

As I had assigned the task of preparing a long essay, most of the students had prepared the essay as per the instructions, and a few students expressed the reasons for not completing the project work. And I provided them a few days to complete the task. Meanwhile, I provided feedback on their essays and guided them to make a final draft of the essay to record them in the file of project work. To make a clear understanding of the topic, we discussed the topic, and most of the students took part in the conversation actively. After the reading, writing, and observing (i.e., watching and listening) activities, students were taken towards preparing a draft of a speech to present in the class and one day, public speaking training was conducted by using multimedia and teaching the techniques of giving a speech. Students presented their speeches one by one every day. I evaluated their speech based on the modified criteria of internal assessment (e.g., report preparation-5, accuracy and clarity-5, confidence and style-5, content coverage-5, Timing-5), and I converted 25 marks into 16 marks to match the criteria of the internal assessment guideline, as there is a provision of testing listening and speaking for 16 marks. Thus, this project work contributed to the development of not only all language skills and aspects but also collaboration, confidence, creative, and interpretive skills as the students got help from peers, teachers, and other references during the process.

There was a girl who was unable to buy a copy for making notes, but she bought a grammar book and practice book, being encouraged to learn English after I conducted public speaking training for a week. I asked her, “Why and how did you manage the money for all these things?” She happily answered that she went to work on the farm as a labourer for five days and earned twenty five hundred rupees, which was enough for her. After such a long preparation, huge efforts, and investment of time, effort, and dedication, she was able to give such a nice performance. The integrated and task-based activities encourage students to be involved in learning activities for a long time (Joshi, 2024). He further claimed that the writing proficiency gaps could be maintained through continuous support to the students and involving them in publishing booklets of their project works. Similarly, Joshi (2025) claimed that the empathetic communication and supportive environment in the class help students to cope with stress during the preparation and presentation of academic activities. Furthermore, active participation and confidence of students can be enhanced through balanced project work in EFL classrooms (Aubrey, 2021; Giri, 2016). To sum up, it is certain that the PBL enhances the learner investment if the project works are designed carefully and if the students are supported in each step, not only in the classroom but also through technology and library resources.

Classroom/Peer Teaching Project

My English medium students were good at reading and average at speaking and writing skills. Therefore, I guided them to select any reading text and prepare for teaching to develop all their language skills integratively. Therefore, I provided this project work during the long holiday of Dashain and Tihar. When the classes began, I checked my students’ project works and provided feedback on their word meanings, answers to the comprehension questions, and other tasks that they had worked on. Before getting them to present their lessons, I explained and clarified their confusion related to the texts. I guided my co-teachers (students) to present their lessons at the beginning of the class within the timeframe of ten to twenty minutes, but some students requested the whole period of 45 minutes, and then I checked their preparation first and allowed them to take the whole class, ensuring detailed preparation. Meanwhile, I facilitated and judged them during their presentations. Some of the students presented excellent, and some did average. However, the hopeful point was that they maximized their time, efforts, and devotion in English language learning activities.

There was a boy in grade ten who used to stay passive in the class, but he used to ask questions related to English, not related to the current topic. When I provided him a chance to teach, he taught in such a way that students exclaimed with delight that his performance was perfect. After the presentation, I asked him how much time he had spent preparing for the lesson, and he replied with pride that he had spent a week for the preparation; consulting extra books, watching YouTube videos, and discussing with Chat GPT to prepare the lesson. Similarly, there was a girl in grade nine who was assumed to be fussy as she used to remain passive but talkative with her friends. She was average in subject matter, quiet, and not interested in communicative activities in English. However, when she got a chance to present her lesson, she used a clear, confident, commanding voice while teaching and used English most of the time. I asked her the same question, and she replied that she had worked two weeks to prepare a lesson. Rusli et al. (2021) accepted that peer teaching is significant to enhance the academic achievement of students as it creates an environment that develops confidence and motivation. Yuliani (2017) also supported this and claimed that PBL promotes learner autonomy.

Integration of Internal Evaluation with PBL

National Curriculum Framework (2076), Secondary Level Curriculum (2078), and Internal evaluation criteria (2080) recommend the incorporation of internal evaluation of English from nine to twelve with regular learning facilitation process through creative tasks and project works. Similarly, there are listening and speaking skills to be tested separately for 16 marks. However, the curriculum’s intention is for integrated language learning activities. Therefore, I decided to test language skills integratively through project works that I discussed earlier. I tested listening and speaking skills as per the curriculum during the classroom teaching. Saud et al. (2024) also emphasized the modification of internal assessment rubrics to contribute to learning language with a holistic approach rather than just evaluating students’ achievement.

Challenges and Possibilities of PBL in EFL Classrooms

Besides the unlimited benefits of project-based learning, due to more closures of schools and frequent holidays, not all of the students got a chance to present their projects by taking the sufficient time they wanted. Additionally, the lack of time challenged me as well because I could not conduct learning activities by covering all the projects mentioned in the textbook. Although the students were motivated to engage in project work, a few students got frustrated due to the lack of resources that they required to prepare for the projects. Some students have neither access to additional materials nor the library (e.g., physical or digital), in the initial stage, they did not accept these PBL techniques as it was new and had never been presented in class before as a regular part of learning, so the lack of confidence prevented them from smooth learning. Similarly, the students with a poor language base tried to avoid the project works, but they did so after the huge support and encouragement.

Despite the challenges, the project-based language-learning model creates space for an open, context-specific, and active learning environment if we can manage the challenges mentioned earlier. Similarly, the effective implementation of internal evaluation incorporated with regular teaching and PBL techniques can ensure the required investment and engagement of all learners and support for proficiency gaps as well. The internal evaluation criteria are used for providing marks to prepare results, but these have not been incorporated effectively with classroom teaching and internal evaluation in many schools, due to students feeling threatened in project works without a support system (Saud et al., 2024). Therefore, only after creating supportive mechanisms and effective implementation of internal evaluation can learning opportunities be provided (Joshi, 2025). Devkota et al. (2017) explored the challenges and opportunities, and their findings are also similar to my study, as they mentioned that the time and school environment play vital roles in making PBL more fruitful in EFL classrooms.

Conclusion

As the purpose of the study, the investment in students for the English subject increased at a satisfactory level. I wanted my students to spend at least an hour every day. However, some of them provided up to two to three hours, two weeks, and most of them gave an hour happily, although they used to give only five to twenty minutes. Similarly, they increased their efforts and invested money not only in reference materials but also invested time to consult the library. As a result, they performed better in the class, their handwriting improved, clarity and confidence increased, and they learnt collaborative skills to give and take help in the learning process. Although the project work was new and unique, and the previous trend was just a repetition of the course content in vacations, my students accepted the plan for project work easily after they observed some project works in videos. Not only during the project work but also in regular teaching, the technique (e.g., encouraging students to share their learning in the class as a task or a project) made students alert and prepared. This study will be helpful and a reference for those English language teachers who want to implement PBL in EFL classrooms to enhance learners’ active participation, and for language policy designers to revise the internal assessment guideline in the coming days. This study only presented the reflections of two project works, just for internal assessment and fostering learner investment, and further investigations can be conducted to integrate soft skills in the language learning process through project-based learning.

References

Acharya, S. (2023). Perceptions, practices, and challenges of applying project-based learning in health education. Journal of Education and Practice, 14(2), 112–121.

Aldabbus, S. (2018). Project-based learning: Possibilities and challenges in primary classrooms. International Journal of Education and Research, 6(4), 75–88.

Aubrey, S. (2021). Enhancing English language learner engagement through project-based learning. TESOL Quarterly, 55(3), 780–804.

Bastola, B. (2021). Project-based learning to develop problem-solving skills in English language classrooms. Journal of NELTA, 26(1–2), 45–58.

Beckett, G. H. (1999). Project-based instruction in a Canadian secondary school’s ESL classes: Goals and evaluations [Unpublished doctoral dissertation]. University of British Columbia, Canada.

Burns, A. (2009). Doing action research in English language teaching: A guide for practitioners. Routledge.

Curriculum Development Centre. (2019). National curriculum framework for school education. Government of Nepal, Ministry of Education, Science and Technology.

Curriculum Development Centre. (2021). Secondary level (Grades 9–10) English curriculum. Government of Nepal, Ministry of Education, Science and Technology.

Curriculum Development Centre. (2023). Internal evaluation guideline for school education. Government of Nepal, Ministry of Education, Science and Technology.

Darvin, R., & Norton, B. (2023). Investment and motivation in language learning: What’s the difference?. Language Teaching56(1), 29-40.

Devkota, B., Karki, R., & Shrestha, S. (2017). Challenges and possibilities of implementing project-based learning in EFL classrooms in Nepal. Journal of Education and Research, 7(1), 32–49.

Dhungana, A. (2025). Investigating the effectiveness and implementation challenges of project-based learning: A case study of public school teachers in Chitwan, Nepal. Journal of Balkumari College14(1), 89-96.

Dhungana, K. (2025). Effectiveness and implementation challenges of project-based learning in English language teaching. Nepal Journal of Language Education, 10(1), 15–28.

Gibbes, M., & Carson, L. (2014). Project-based language learning: Learners’ perspectives. Innovation in Language Learning and Teaching, 8(2), 171–189.

Ginting, D. (2021). Student engagement and factors affecting active learning in English language teaching. Voices of English Language Education Society5(2), 215-228.

Giri, R. A. (2016). Project-based learning as a 21st-century approach in English language teaching. NELTA Journal, 21(1–2), 12–25.

Guslyakova, L., Kuznetsova, N., & Ivanova, E. (2021). Problems of implementing project-based learning in EFL classrooms. European Journal of Education Studies, 8(10), 34–46.

Joshi, D. R. (2024). Teachers’ experiential strategies for bridging writing proficiency gaps among secondary level students. Far Western Review2(2), 91-105.

Joshi, D. R. (2025). Exploring counselling-based pedagogy in EFL classrooms: Perceived values of English language teachers in Nepal. Far Western Journal of Education2, 57-73.

Karki, S. (2018). Effectiveness of project work in developing students’ speaking skills. Journal of NELTA, 23(1–2), 101–113.

Kemmis, S., McTaggart, R., & Nixon, R. (2014). The action research planner: Doing critical participatory action research. Springer.

Maulina, M. (2024). Empowering English language learners through project-based learning for language proficiency. Indonesian Journal of Applied Linguistics, 14(1), 66–78.

Mertler, C. A. (2019). Action research: Improving schools and empowering educators (6th ed.). Sage Publications.

Nasir, M., & Dermawan, A. (2022). Enhancing learners’ participation and confidence through project-based learning in EFL contexts. Asian EFL Journal, 24(5), 90–104.

Rusli, M., Degeng, N. S., Setyosari, P., & Sulton. (2021). Peer teaching: Students teaching students to increase academic performance. Teaching Theology & Religion24(1), 17-27.

Sanchez, R. (2019). Effectiveness of project-based learning to improve students’ speaking skills. English Language Teaching Journal, 12(6), 123–134.

Saud, M.S., Aryal, S., & Sapkota, J.L. (2024). Student assessment in formal education: Nepali community school teachers’ perspectives. Prithvi Academic Journal7, 67-77.

Somani, R., & Rizvi, M. (2018). A comparative study of project-based and traditional approaches in English language teaching: A quasi-experimental design. International Journal of Instruction, 11(3), 15–30.

Yuliani, S. (2017). Promoting learner autonomy through project-based learning in EFL classrooms. Advances in Language and Literary Studies, 8(2), 68–77.

Author’s Bio: Dev Ram Joshi is an English language teacher at Mahunyal Secondary School, Bhajani-1, Kailali and the MPhil scholar at Far Western University, Nepal. He has been teaching English at the secondary level for over ten years. His areas of research interest include language proficiency gaps, psycholinguistics, motivation, transformative pedagogy, learner empowerment, self-directed learning and professional development, ecosystem in language education, and ELT material development. He can be reached at teacherdrjoshi@gmail.com.